
|
Hardware
|
Software
|
Systems
|
Programs
|
| Design | Design | Design | Management |
|
Assembly
|
Code
|
Fabrication
|
Logistics
|
|
Installation
|
Modification
|
Integration
|
Support
|
|
Test
|
Upgrade
|
Rehost
|
Documentation
|
|
Integration
|
Upgrade
|
Analysis
|
|
|
Test
|
Modification
|
IV & V
|
|
|
Documentation
|
Test
|
||
|
Acceptance
|
|||
|
Qualification
|
| AIRBORNE EXPRESS, INC.
DC9-30 Full Flight Simulator: OPINICUS is building a
DC9-30 full flight simulator to be qualified FAA Level C under
AC120-40B for Airborne Express Inc. This new simulator will be
all electric utilizing an electric motion system and OPINICUS' electric
control loading system, REALFeelTM. E6A Digital Electric Control Loading: OPINICUS upgraded the two Navy E6A OFT simulators at Tinker Air Force Base (AFB) by replacing the existing hydraulic control loading with OPINICUS' extra high force digital electric control loading REALFeelTM series 4000XX. Eleven channels per simulator of controls were replaced including the primary controls, toe brakes, stabilizer trim, and emergency landing gear. NORTHWEST AIRLINES DC-10s, DC-9s, B747-400s, B747-200s, B767s, A320s, B757S: To Provide hardware and software upgrades to standardize simulators of various vintages, manufacturers, and configurations. The program includes the replacement of all Host computer systems and upgrading each simulators Real-Time simulation load; replacing existing hardware subsystems including IOS, Control Loading, Linkage systems, Aural Cue/Sound systems. NAV/COMM Audio systems, Weather Radar systems, Motion systems, and various sub system Interfaces. OPINICUS will develop, integrate and test the Real-Time load for each aircraft type utilizing our off-line development system, and the OPINICUS designed suite of tools and utilities which allows for a minimum amount of simulator down-time. OPINICUS' REALFeelTM electric control loading was used to replace the existing controls on the simulators. |
OPINICUS
Corporation
1827 NorthPointe Pkwy
Lutz, Florida 33558